My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101956
DRMS
>
Back File Migration
>
Revision
>
REV101956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:30 AM
Creation date
11/22/2007 12:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Revision
Doc Name
EVALUATION OF CYLINDRICAL AND LONG HORIZONTAL CAVITY SIZE NATEC LEASES PICEANCE CREEK BASIN COLO
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • length of the cave:ms. Recent technology developments in drilling long horizontal holes <br />in excess of 6601't indicate that cavem lengths of up to 1500 ft are possible. We see no <br />stability reason to limit the length of the cavems. <br />• Pillar dimensions between long prismatic cavems should be increased to accotnmodate <br />potential drift in the horizontal drilling and to maintain a minimum upper pillar dimension <br />of 30 ft. Tktis requires a minimum spacing between horizontal boreholes of 88 ft. <br />• The above present specific recommendations forcylindricalcavem dimensions, prismatic <br />cavern length, and prismatic cavem spacing. The following lists additional actions/e- <br />valuations that should be undertaken to improve the confidence in the solution cavity <br />design. <br />- The core from adjoining core holes should be inspected and tested for strength and <br />deformabiliry to enhance the database for design. Limited coring should be com- <br />pleted on future core to confum previous test data. <br />- A thetutomixhanical analysis should be completed to evaluate the heat loss to the <br />• fomtadon and the thermally-induced stresses around the caverns. <br />:t ~ - Solution ca~rities should be developed on a wide spacing (at least every other one) <br />to allow monitoring of performance and cavem development. Once cavem shape <br />and intermediate term stability has been established cavern development between <br />the initial cavems can be completed <br />• <br />,j. F. T. Agapito & Associates, Inc. 4 <br />=: ~ . .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.