Laserfiche WebLink
EHHIBIT 8 - RECLAMATION PLAN <br />:, <br />TABLE OF CO~ENTB <br />PAGE NO. <br />E.1 INTRODUCTION. E-1 <br />E.2 POST-MINING LAND USE. E-1 <br />E.3 GENERAL RECLAMATION GOALS AND PROCEDURES. E-2 <br />E.4 SITE-SPECIFIC RECLAMATION PROCEDURES. E-3 <br />8.4.1 Construction and Well Field Reclamation. E-3 , <br />8.4.2 Regulatory Compliance. E-6 <br />8.4.3 Well Field and plant Decommissioning E-15 <br />• E.5 RECLAMATION SCHEDULE. E-17 <br />E.6 RECLAMATION MOIQITORING. E-17 <br />E.7 SURFACE AND GROUND WATER PROTECTION E-19 <br />8.7.1 Surface Water. E-20 <br />8.7.2 Ground Water E-21 <br />E.8 CONTINGENCY PLAi~S <br />E-23 <br />• <br />