Laserfiche WebLink
• uncertainty in the final shape of the cavems, the shaping of cavems and production wells will <br />~ be greater than 88 ft. Wc; recommend that the initial phase of solution mining be designed to <br />recover every other cavem, leaving the intervening cavems for secondary recovery after [he <br />cavem size and caving condition have been monitored. After completion of the fast phase of <br />solution mining, additional site data and core test data will be available on which to base the <br />final pillaz sizes. <br />• <br />f <br />• <br />J. F. T. Agapito & Associates, Inc. 30 <br />