Laserfiche WebLink
<br /> <br />TABLE N0. 1 <br /> <br />Estimated Reclamation Costs for Canon Dolomite Quarry <br />a <br />C~ <br />Upper depleted area 7 ac. @ $750/ac.* _ $ 5,250 <br />Developed area 11 ac. @ $750/ac. = 8,250 <br />Future area 22 ac. @ $750/ac. = 16,500 <br />North and South Extension 6 5 ac. @ $750/ac. = 4,875 <br />Fines Disposal Area No. 1 12 .5 ac. @ $750/ac. = 9,375 <br />Shop and Office Area 3 ac. @ $750/ac. = 2,250 <br />Construct Water Bars on Ro ad = 2,000 <br />Dismantle Shop & Office = 3,000 <br /> Total $51,500 <br />*Estimate at $600/ac. for cost of materials and application <br />$150 for grading and ground preparation. <br />7/22/82 <br /> <br />