My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101955
DRMS
>
Back File Migration
>
Revision
>
REV101955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:30 AM
Creation date
11/22/2007 12:50:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
Revision
Doc Date
7/26/1982
Doc Name
LETTER
From
CF&I STEEL CORP
To
MLR
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Adequacy Review Response <br />CF&.I Canon Dolomite Quarry <br />File No. 77-376, Amendment No. 1 <br />This response addresses concerns of the Division in <br />the order that the issues were raised in the letter to CF&I <br />Steel Corporated dated July 13, 1982. Therefore, these <br />responses are numbered 1 through 3. <br />1) The final reclamation plan for the quarry is as follows: <br />Office & Shop Area - Upon completion of mining, the <br />office and shop will be dismantled. Salvageable items <br />will be removed from the site. Nonsalvageable items <br />(concrete footers, etc.) will be buried in a waste <br />disposal area or other area on site that would be <br />acceptable to CF&.I and the Division. Areas of <br />overcompaction will be ripped or otherwise loosened. <br />• Minor grading will be accomplished to blend the disturbed <br />area with the surrounding undisturbed area. Revegetation <br />will be as per Exhibit E of the existing plan. <br />Roads - CF&I intends to leave the roads as it feels they <br />are a valuable asset to the property and would be <br />beneficial for the post-mining land uses of rangeland and <br />wildlife habitat. Upon completion of mining, steep areas <br />of the roads (over 8~) will have water bars constructed at <br />spacings of no more than 300 feet. <br />Waste Rock Disposal Sites (existing) - The large <br />boulders in Diablo and Echo Canyons will be left as they <br />now exist. The fines that currently are along the south <br />side of Echo Canyon will be removed when the quarry floor <br />reaches the same elevation as the floor of Echo Canyon, or <br />they will be stabilized with vegetation. No benches are <br />planned for the existing disposal sites. <br />Waste rock disposal sites (proposed) - At this time, <br />CFFcI does not plan to bench the fines disposal area <br />(proposed area No. 1), as the side slopes are not exces- <br />sively long. Revegetation will be accomplished in <br />accordance with the existing plan. <br />• Revegetation Plan - CF&I does not feel that the addition <br />of Pinon and Juniper to the planting mix would be <br />
The URL can be used to link to this page
Your browser does not support the video tag.