<br /> <br />M-77-560 <br />12/12/94 <br />page 2 <br />4. Reclamation of the pond margins in the west area wi:Ll follow <br />the existing plan for the original permit area. This will <br />therefore include planting of woody species. This needs to be <br />specifically stated, and include species, quantitic>s, size, <br />etc. Is the dotted symbol on the map the water level or a <br />line of trees? <br />5. You have delineated the separate areas on the reclamation plan <br />map which will be reclaimed differently. The western portion <br />of the expansion (batch area) will be left for commer~~ial use, <br />and not be topsoiled or planted. Please clarify what <br />treatment the pond banks within that portion are to receive. <br />My suggestion would be to reclaim all pond banks. <br />6. The three large stockpiles to the north are shown t:o remain <br />after reclamation. Please state what reclamation is to occur <br />on those surfaces to stabilize or revegetate them. <br />7. The 30-inch discharge flume at the north side of the~aast pond <br />is to be removed. Please provide the specifications necessary <br />for calculating its removal cost, ie., materials, dinnensions, <br />distance to disposal site, etc. Is it to be buried or hauled <br />away? What material, and how much volume, is involved in <br />filling the discharge ditch? <br />8. The culverts installed for the slurry between the existing <br />east pit and the expansion area must be bonded for their <br />removal. Please provide similar information for these as that <br />requested in item ,f7. <br />9. What are to be the active pit slopes during mining? For bond <br />amount purposes, the volume of material to be moved for <br />grading to final slopes must be known. ' <br />10. Please calculate a revised total bond amount for the zimendment <br />areas. Include in it all the information requested above. <br />Try to either separate the amounts by task, by land area, or <br />by stage (based on years). The total amount of reclamation <br />work and relevant costs should be estimated, based oi~ maximum <br />overall disturbance. <br />If desired, however, you may commit to phased reclamation. <br />1~;'This will require you to explain the separate stages of mining <br />I ; and reclamation, including an estimate of when each will <br />occur. The phased bond must be adequate to aver the <br />1 necessary reclamation at any point of maximum disturbance. It <br />1 must be adequate for all work required to bring they site to <br />its stated final land use, from any point of the operation <br />within the stages to be bonded at that time. <br />