Laserfiche WebLink
_ - - <br />.,~~' `9~ti HIGH PLAINS S1°ONE CO. <br />x' ~ (!~ Business Office So. Sales Yard <br />5232 Quail St. 13113 So. Hwy. 83 <br />Nj~ G~ Wheat Ridge, CO 80033 Pazker, CO 80134 <br />ENE (303) 422-9424 (303) 841-3338 <br />~~ <br />EXHIBIT C - Flining Plan <br />1. Dates - Flining will commence as soon as proper permits <br />are established and will continue as long as stone <br />supply is available, permit is valid, and market trends <br />support extraction, <br />2. Topsoil - Due to the nature of the rock slide that rock <br />will be extracted from the top soil consideration will <br />not apply. No soil will need to be removed or relocated <br />because the rock area is all surface. <br />3, Because the slide rock is on top no overbudren or waste <br />rock will need to be removed to reach deposit. <br />4, Slide rock will he removed to a maximum of 3 meters, <br />the deposit ranges from 1 to 30 meters. <br />5. Major Components - The major components of our mining <br />operation will simply involve the parking area for <br />employee's vehicles (not to exceed 4 pickup spaces) <br />along the existing access road, and a 10' X 20' area <br />for a mobile crane, 17o maintenance building, processing <br />plant, office or other permanent structures will be <br />necessary. <br />6. Disturbances - There will be no significant disturbances <br />to the land surface. <br />7, Roads - An access road already exists to the general <br />mining area. Three to four short access points (less <br />than 10 meters each) will be needed to gain access to <br />the slide areas. Construction or improvements of new <br />or existing roads will not be necessary. <br />8. Water - No water will be needed for extraction purposes. <br />Drinking water will be provided with bottled tiaater. <br />9. Ground Water - Due to no excavation no ground water or <br />surface water will be encountered. <br />10. ldater Rights - No existing water rights will be disturbed, <br />altered or infringed upon. <br />11. Processing - 911 material disturbed will be extracted. <br />No on site milling or preparation is necessary. Stone will <br />simply be extracted, stacked on palletts and removed by <br />truck via access road. Flo plant facilities, tailings, <br />heaps or drainage alterations will be made. <br />