Laserfiche WebLink
• r III IIIIIIIIIIIIIIII <br />999 <br /> STATE OF COLOlZADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Sherman 51., Room 215 ` <br /> <br />Denver, Colorado 80203 I <br />~~~~ <br /> <br />Phone: (3031866-3567 I <br />FAX: 1303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCE <br />February 10, 1497 Roy Romer <br /> Governor <br />Craig Grotenhouse lames 5. Lochhead <br />ExecNive Director <br />Colorado Lien Company Michael 8. Long <br />P. 0. ]3ox 440 Division Director <br />Rapid City, SD 57709 <br />RE: Roberts Quarry, Technical Revision Approval, Permit No. M-77-301, Revision No. <br />TR-1 <br />Dear Mr. Grotenhouse: <br />On February 6, 1997 the Division of Minerals and Geology approved the Technical Revision <br />application submitted to the Division on August 5, 1996, addressing the following: <br />Construction of Che tie-across haul road to the Rex Quany. <br />The terms of the Technical Revision No. 1 approved by the Division are hereby incorporated into <br />Permit No. M-77-301. <br />The conditions of [he Division approval are noted below. Please note that all other provisions <br />of Permit No. M-77-301 remain in full force and effect. <br />Stipulation No. Description <br />The operator must submit the required reclamation bond increase of $5,401.00 <br />within 60 days of approval of this revision, only if no additional changes occur <br />as a result of the reclamation liability adequacy inspection which will be <br />conducted on February 19, 1997. If the scheduled inspection reveals that <br />additional bond will be required for the entire site, the amount of bond submitted <br />shall be commesurate with the additional increase as determined by the inspection <br />and subsequent reclamation bond re-calculation. <br />