My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101884
DRMS
>
Back File Migration
>
Revision
>
REV101884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:25 AM
Creation date
11/22/2007 12:50:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
11/5/1985
Doc Name
TRAPPER MID TERM BOND CALCULATIONS
From
MLRD
To
GREGG
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_* <br />v. <br />S <br />Facilities Removal <br />Mike Savage and Trapper apparently agreed on a facilities removal cost of <br />$86,060. No detailed calculations are included in the record to substantiate <br />this. My estimate using Means Construction Data, and some estimates for items <br />not included in Means, came to $141,400. Although Means usually gives a very <br />conservative estimate, the costs I used did not include demolition of the <br />building foundations, as no information was given on them. Therefore I feel <br />that this may be a reasonable estimate. <br />Item Trapper Est. Savage Est. Deckler Est. <br />Regrading 2,822,522 4,619,987 5,118,672 - 3,642,047 <br />Retopsoiling 1,319,127 1,246,530 1,221,497 <br />Revegetation 757,202 770,391 877,562 <br />Facilities <br />Removal 86,060 86,060 141,400 <br /> 4,984,911 6,722,968 7,359,131 - 5,882,506 <br />Note: Although Mike Savage's estimate of bonding liability was $6.7 mil., the <br />request by the Division before the Board was for $5.9 mil.. I have not found <br />anything in the record to explain this. Mike has indicated that some <br />recalculation was done before going to the Board, however there is no record <br />of this in the file. The $5.9 mil. figure is close to my estimate, if we use <br />the Wagner lease agreement for regrading costs. The current bond is $5.25 <br />mil.. <br />I feel that we can go either of two ways with this. <br />We can say that my lower calculation is close to what was <br />asked for before the Board, and so there is no reason to <br />ask for the additional $700,000. <br />We can ask for a higher amount of up to $7.35 mil., and <br />probably end up going before the board. If we choose this <br />path, I think that we should refine the revegetation and <br />facilities removal costs and cite appropriate references <br />before going to the board. <br />Doc. 4701 <br />
The URL can be used to link to this page
Your browser does not support the video tag.