Laserfiche WebLink
-.a <br />"~ ` ~;, <br />BB~-R°C~OAL CO., iNC. III IIIIIIIIIIIIIIII <br />Phone 303-9~9~5775 Somerset. Colorado 81434 <br />October 3, 1984 <br />RECEIVED <br />OCT 0 41984 <br />Mr. Dan Mathews MINED LAND RECLAMATION DIVISION <br />Colorado Mined Land Reclamation Division Colo.DepLafNaturalResources <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Bear Coal Company Mine No. 3 FTood Control Plan <br />Dear Dan: <br />As outlined in an Inspection Report dated June 5, 1984 by Roy Cox, <br />Bear Coal Company has completed a flood control plan for the North <br />Fork of the Gunnison River which flows adjacent to Bear Coal Company <br />Mine No. 3 facilities. This flood control plan has been developed <br />from estimates of the 100 year event and existing design of the <br />channel by the Colorado Department of Highways, based on discussions <br />with Eldon St rid of ACZ Inc. on July 25, 1984. <br />The Bear Coal Company plans to complete construction of the dike this <br />fall. Please review this information and contact Mr. Craig Springer <br />at Bear Coal Company or Eldon Strid of ACZ Inc. with any questions. <br />Sincerely, <br />BEAR COAL COMPANY <br /> <br />William A. Bear <br />cc: E, Strid, ACZ Inc. <br />:t <br />sae ..,,,.~.A» <br />.4\_ _ _ _ <br /> <br />I _ __ _ _ e_.. ~ <br />