My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-02-13_REVISION - M1981302
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1997-02-13_REVISION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 3:57:07 PM
Creation date
11/22/2007 12:48:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
2/13/1997
Doc Name
91131D DEEPE PIT
From
SCOTT COX & ASSOCIATES INC
To
HART & ASSOCIATES
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 11111111111lIlll 111 • <br />~~SCOTT, COX&ASSOCIATES, INC. consulting engineers • surveyors <br />.v.. Eu~~.ud (Ja»2u~e I\', P E. • N'lllia~~.~ H. A111: ,~Il rl d, P E. <br />February 13,1997 <br />Mr. Michael J. Hart <br />Hart & Associates <br />P.O. Box 1303 <br />Boulder, CO 80306 <br />Ref: 91131D - Deepe Pit <br />Dear Mike: <br />The purpose of this letter is to respond to your request for information on the <br />potential impacts on reclamation-related earth moving efforts due to the changes <br />between the previously approved MLRB reclamation plan and the revised plan <br />currently submitted for review. <br />The intent of both plans are to balance on-site earthwork quantities. The primary <br />reasons for the proposed lakes in the original plan was to provide a source for <br />material (shale) which could be used to meet the proposed reclamation plan grades. <br />Based on the final mined material volumes and the currently proposed reclamation <br />plan grades, additional shale excavation is not required in order to obtain materials <br />to provide an earthwork balance for the site. <br />In summary, there is significantly less reclamation related earthwork required to <br />meet the final grade elevations of the currently proposed reclamation plan. This is <br />the result of maintaining earthwork balances and planning for different final <br />reclamation grades. <br />I hope this addresses your concerns. Please don't hesitate to contact us if you have <br />additional questions. <br />Sincerely, <br />SCOTT, COX & ASSOCIATES, INC. <br />William H. Mitze ~ <br />cc: Mr. Ed McDowell <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.