Laserfiche WebLink
4 <br />3.5 <br />3 <br />m 2.5 <br />v <br />c <br />m 2 <br />`c <br />~, <br />p 1.5 <br />0 <br />1 <br />0.5 <br />1996 1997 1998 1999 <br />-Rainfall -Bateman t Carlton Tunnel Flow <br />•' <br />SI-I)rPHC~ I LL)/R <br />'IGURE 3 -RELATIONSHIP BETWEEN PRECIPITATION AND FLOW RATE <br />'ROM THE CARLTON TUNNEL <br />2, 000 <br />1, 750 <br />1, 500 <br />1,250 <br />E <br />1,000 <br />0 <br />750 <br />500 <br />250 <br />0 <br />Date: 11!22/1999 <br />Project: 100567 <br />File: <br />