My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101618
DRMS
>
Back File Migration
>
Revision
>
REV101618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:08 AM
Creation date
11/22/2007 12:47:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
6/3/1999
Doc Name
BOWIE RESOURCES LIMITED BOWIE 1 MINE WINDY GAP PROCESS TR-029 & TR-031 PN C-81-038
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
TR31
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. ~ STOVER I& ASSOCIA~S <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 . <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />June 1, 1999 <br />Joseph J. Dudash <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources Limited -Bowie No. 1 Mine <br />Windy Gap Process <br />TR-029 & TR-031 <br />Permit C-81-038 <br />Dear Mr. Dudash: <br />iii iiiiiiiiiiiuiii <br />sss <br />CML ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />JUN 0 31999 <br />" clon of Minerals & Geology <br />The estimated water depletion from the Bowie No. 1 Mine was last evaluated in 1993 (Ref <br />Volume 9A, Tab, Fish and Wildlife). <br />Technical revision number 29 is associated with the construction of the east ridge waste <br />disposal area. This action will increase the size of the gob pile sediment pond by 0.16 <br />acres. Technical revision number 31 provides for an increase in production at the unit <br />train loadout to 3 million tons per year. <br />Enclosed is an updated analysis of water depletion at the Bowie No. 1 Mine which is based <br />on the assumptions that mine production will not exceed 1.0 million tons per year, <br />throughput at the loadout will not exceed 3.0 million tons per year and potential <br />evaporation will be realized from each sediment pond. The enclosed Windy Gap Process <br />analysis should be inserted into Volume 9A, Tab, Fish and Wildlife. Estimated <br />consumptive use at the Bowie No. 1 Mine is expected to decrease from 64.2 to 53.5 acre- <br />feet per year. <br />Please call if you have any questions. <br />Sincerely, <br />~~~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr., Larry Kline, BLM <br />
The URL can be used to link to this page
Your browser does not support the video tag.