My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101594
DRMS
>
Back File Migration
>
Revision
>
REV101594
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:07 AM
Creation date
11/22/2007 12:47:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
2/7/2006
Doc Name
Review Letter for Bond Release
From
Peak Project Management
To
DMG
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~av~o <br />FEB 0~: 2006 <br />pivis~on of Minercls and Geo1o9Y <br />February 6, 2006 <br />Mr. Kent Gorham <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. CO 80203 <br />Re: New Elk Mine Permit No.: C-81-012 <br />Bond Release Request <br />Deaz Mr. Gorham: <br />Peak Project Management, LLC <br />34115 County Road 20.8 <br />Trinidad, CO 81082 <br />Telephone/Fax: (719) 846.4975 <br />Cell: (719) 859-6111 <br />e-mail: ronthompsor~sensonics.org <br />I have reviewed the initial bond release application as a follow-up to the Bond Release inspection <br />conducted by the Division on January 3 ], 2006. The West Portal Core house Area was included in the <br />application, and as noted during the inspection, Phase I reclamation has been completed in that area. <br />By letter dated November 21, 2005, Picketwire Processing requested that the West Portal Manway, <br />Substation, and the Longwall Warehouse (#2) be withdrawn from consideration. The work in these azeas <br />has been completed and they should be considered as part of the bond release request. <br />In the same letter, request for release of bonding for the Technical Revision approving Underground Refuse <br />Disposal was withdrawn. This withdrawal should also include reclamation of the RDA Benches. This work <br />has been completed, but a plan to recycle and recover coal contained within the refuse material is under <br />consideration. This may result in re-disturbing some or all of the RDA reclamation. <br />Since the initial bond release request was submitted, additional reclamation at the West Portal has been <br />completed. As such, Picketwire Processing would like to amend the initial application to include the <br />following activities: <br />1. WP Warehouse#1 Demolition and Rough Grading <br />2. Pump House Access Rd. Rough Grade and Ripping <br />3. C-4 tit' x 36" Culvert Removal <br />4. C-10 18T x 15" Culvert Removal <br />5. C-43 Culvert Removal <br />6. C-62 12.5' x 12" Culvert Removal <br />7. C-63 12.5' x 12" Culvert Removal <br />The bond release application has been amended to address the above referenced items and recalculate the <br />bond release amount requested. These revised items are included with this letter. Please contact me if you <br />require additional information. <br />Sir~erely, <br />61r1/- t1~0+'~ <br />Ron Thompson <br />
The URL can be used to link to this page
Your browser does not support the video tag.