Laserfiche WebLink
Permit M77-424 Amendment 1 <br />EXHIBIT L <br />RECLAMATION COSTS <br />Exhibit L <br />Page 1 of 1 <br />The following table summarizes the costs associated with reclaiming both the water <br />transmission pipeline and the evaporation pond. All costs were estimated as of July <br />2006. <br /> Task Cost <br /> EVAPORATION POND <br />1. Mobilization $6,000 <br />2. Preci itate Removal and Dis osal $51,799 <br />3. Liner Removal and Dis osal $12,056 <br />4. Concrete Demo on Pond Site $6,000 <br />5. Removal of Wildlife Fence $12,865 <br />6. Gradin and Contourin $93,880 <br />7. To soil Placement $23,250 <br />8. Reclaim Roadwa to Pond $11,372 <br />9. Reve elation $47,910 <br />Total Pond Reclamation Cost $265,132 <br /> <br /> WATER TRANSMISSION PIPELINE <br />1. Pum Sediment from Two Manhole Sums $1,500 <br />2. Pum Water from Inverted Si hon $770 <br />3. Flush Pipeline with Clean Water $2,500 <br />4. Plu Ends of Pi eline $1,800 <br />5. Demo 5 Manholes on Pi eline $5,052 <br />6. Weld Manhole Lids and Reve elate $11,968 <br />T otal Pi eline Reclamation Cost $23,590 <br />Total Cost $288,722 <br />