My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-25_REVISION - M1984041 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2007-09-25_REVISION - M1984041 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:28:41 PM
Creation date
11/22/2007 12:46:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
9/25/2007
Doc Name
Succession of operators approval
From
DRMS
To
American Gypsum Company
Type & Sequence
SO4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />WHEREAS, the Operator and FIBEPAP' S FDPD INSDRANCS CaltPANY (the "WarraruoI"), <br />a corporaticn organized and ezistittg under the laws of the 5ta:e of cAr.IFOPPIn and duly <br />authorized to transact a bonding and surety business in the State of Colorado are hereby and firmly bound <br />unto the State In the sum of FIFTY PIPE TPODSAND THIFTY--- Dollars ($ 59,030.110-------) <br />for the life of mine or tmdl such tftne as repiaeement is received, for the payment of which sum, wetl <br />and truly trade, we hereby bind ourselves and our personal representatives, successors and assigns, <br />jointly and severally, firmly by these prt;senu. <br />WHEREAS, the Board bas determined, in alcordance with the Act, that the estimated costs of <br />reclamation of the Affected Latins aze arose amouuu for the stated periods of time as set forth herein. <br />Said amount may be amended from time to time to reflect revised estimates of said costs of reclamation.. <br />WHEREAS, the Operator and the Warrantor, in accorda>xe with the Acr, bas promised and hereby <br />promises the Boatel that it will be responsible for all the estimated costs of reclamation with regazd to the <br />Affected Lands. <br />WHI=REAS, cite $oard has determined that this Financial Warranty by the Warrantor equals the <br />estimated costs of reclamation, as approved by the Board, with regard to the Affected Lands. <br />NOW, TFI)=BEFORE, the Operator and the Warramor aze held hereby firmly unto the State of <br />Colorado in the amount of those sums fair those periods of rime as set forth herein, until this Financial <br />warranty is amended or released in accordance wiffi applicable law. <br />The Board tray, for good cause shown, increase or decrease the amount and durarion of this Financial <br />Wartanry. The Operator shall have sixty (60) days after the date of notice of any such adjustment to <br />increase the surety amount, but no such increase shall bind the Warrantor unless and until it shall have <br />consented thereto in wtiti>;g by the issuance of en additional Financial Warranty or by an tmdorsemetu <br />to this Financial Warranty. <br />The Operator and the Warrantor shall notify the Board immediately of say event which may impair this <br />Pinancial Wazraaty. If the Board receives sttrhh notice, or otherwise has reason to believe that this <br />Financial Warranty has been materially unpaired, it may convene a hearing is accordance with the Aa <br />for the propose of determining whether impairment has occurred. <br />The obligation of the Operator ctrl the Wamntor shall continue until the Board has released this <br />Financial Warranty or has ordered it forfeited in accordance with applicable provisions of the Act. It is <br />understood that periods of years tray necescari[y be required before determination can be made that <br />reclartradon of the Affected Lands has btxn satisfactorily wmpleted. >t is also recognized that, as <br />reclamation is accomplished, the amannt of this Financial Warranty toay be redaced with the approval <br />of the Board so that it reflecra the then current estimated cost of the remairritlg reclamation of the Affeaui <br />Lands. No revision, exttasion, or renewal of the permit, or of the time allowed to complete reclamation, <br />shall diminish the Operator's or Watramor's obligation under this Financial Warraary. No <br />misrepresernarion by the Operator which tray have induced the Watramor to execute this Faraacial <br />Warranty shall be a~ defense to demand by the State under this agreemem_ <br />In any singe year during the life of the permit, the amount of the Financial Warranty shall not excced <br />the estimated cASt of fully reclaiming all lands to be affected in said year. Plus all lands affected in <br />previous permit years and not yet fully reclaimed. Reclamation costs shall be computed with reference <br />ro current reclamation costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.