My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101470
DRMS
>
Back File Migration
>
Revision
>
REV101470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:00 AM
Creation date
11/22/2007 12:45:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
1/21/1994
Doc Name
MEMORANDUM RIGHT OF SUCCESSIVE RENEWAL/CONTINUATION OF OPERATIONS
From
OFFICE OF THE ATTORNEY GENERAL
To
DMG
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"~FROM:natural • TO:Dh1G <br />Mike Long <br />Page 5 <br />J~[J 21, 1994 5:30Prt tt174 P.B6 <br />mal hearing on the Division's proposed decision regarding permit <br />renewal would, of course, have to comply with the publication and <br />time period requirements of Section 34-33-119(4), C.R.S.r i.e., <br />the Division must publish notice of the proposed decision in a <br />"newspaper of general circulation in the locality of the surface <br />coal mining operations once a week for two weeks following issu- <br />ance of the proposed decision," and the Division must wait thirty <br />days from issuance of the proposed decision for any request for a <br />formal public hearing by any potentially adversely affected <br />party. The MLRB must hold a formal public hearing within 30 days <br />of any request. Section 34-33-119(5) and Rule 2.07.4(3)(a)(b). <br />Since Basin has already requested a formal hearing on its renewal <br />applications (apparently because it believes it will be <br />"adversely affected" because any proposed decision will not be <br />acted upon in time to allow it to continue operations after it's <br />permits expire), Basin must waive the requirement that the MLRB <br />hold such a hearing within thirty days of the formal request, ae- <br />auming Basin's request takes effect immediately upon Issuance of <br />the proposed decision and that the next MLRB meeting is more than <br />thirty days from issuance of the proposed decision. in any <br />event, it appears that the MLRB may hear Basin's request for <br />temporary relief because Rule 2.07.4(3,)(d) appears to allow the <br />consideration of a request for temporary relief to be conduoted <br />apart from, and prior to, the formal hearing on the merits of <br />permit renewal proposed decision. <br />Whether Hasin has a substantial likelihood of preva111ng on the <br />merits of the permit renewal depends in part on whether the Divi- <br />sion will recommend approval of Basin's renewal applications, if <br />the Division recommends approval, Hasin will probably prevail in <br />its renewal attempt and will therefore meet the first requirement <br />under Ruie 2.07.4(3)(d) to obtain temporary relief. However, <br />even if the Division recommends against approval of the permit <br />renewal, Basin is correct in its "Memorandum in Support of <br />Request for Public Hearing" (Memorandum) that the Act and regu- <br />lations place the burden of demonstrating that a permit renewal <br />should not be granted lies with the party opposing renewal. See <br />Act, Section 107(7)(4) and Rule 2.08.5(2). Therefore, even i~ <br />the Division proposed not renewing the permit, Basin has an argu- <br />ment that there is still a substantial likelihood that it will <br />prevail on the merits pursuant to the statutory and regulatory <br />presumption/preference in favor of renewal. Whether or not the <br />Division's proposed decision is to approve or deny renewal of <br />Basin's permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.