Laserfiche WebLink
• • Sheet 1 of 2 <br />Colorado Division of Minerals end Geology <br />ESTIMATING FORM - WHEEL LOADER NORK <br />Task #: 5 Prep. by: RCO Task filename M097-5 <br />Date 06/14/96 Permit #:M-94-097 Mine: Spring Creek Pit <br />Permitting action Final Reclamation - Amendment 1 <br />Task description Asphalt spill pad and berm removal <br />HOURLY EOUI PMENT COST <br />_____________________ Basic machine: CAT 936E Horsepower = 140 <br />Attachment #1: ROPS Ceb Shift besis:l/day <br />(DOI D$li) <br />Cost Breakdown - Ownership = (14.53 <br />-------------- - Operating-loader = f15.18 100 X utilization <br />- Operator = f22.95 <br />- Total cost/hr = 552.65 Total fleet cost/hr = f52.65 <br />MATERIAL QUANTITIES <br />___________________ <br />Initial Swell Final <br />vol une = 100.0 CCY factor = 1.125 volume = 112.5 LCY <br />Ouanti ty source/reference ; Amendment application <br />X Swell source/reference program <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump 8 maneuver) = 0.490 min. <br /> (CHB ll$A) - <br />Cycle Time Factors: Factor (min.) <br />Materiel- Mixed material 0.020 (CHB IdA) <br />Pile- No edjustn~ent - factor not applicable 0.000 (CHB IEA) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CHB 18A) <br />Operation- Constant operation -0.040 (CNB l0A) <br />Target- Nominal target 0.000 (CNB IEA) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.470 min. <br />