Laserfiche WebLink
III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl o(Natural Resources <br />1317 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: (30J) 866-1567 <br />FAX: 13031832-8106 <br />November 26, 1993 <br />Ms. Kathleen Welt <br />Mountain Coal Company <br />P.O. Box 591 <br />Somerset, CO 81434 <br />OF ~~ <br />„e~ <br />~. <br />~avs <br />Roy Romer <br />Governor <br />Michael 8. Long <br />Division Director <br />RE: Minor Revision No. 104; West Elk Mine; File No. C-80-007 <br />Dear Ms. Welt; <br />The Division appreciates Mountain Coal Company's clarification on <br />how the construction of the french drains will proceed. The <br />Division would recommend that MCC try to limit the size of the <br />disturbance as much as possible. Topsoil should be stripped, as <br />you have stated in your letter, replaced and seeded immediately <br />after the french drain is installed. <br />Please call if you have any questions. <br />Siryc~'F/ely, <br />Christine E. Johns <br />Environmental Prot <br /> <br />on Specialist <br />CEJ/007MR104 <br />