Laserfiche WebLink
6. Commitment to reclaim roads has been deleted from text (page 2.05-62) as all <br />existing roads are being retained for future industrial uses. <br />7. Hydroseeding will be used on the more steeply extended slopes (e.g. E-1, E-2, N- <br />2, S-3 and W-1). <br />8. Pages 35 and 35A as revised by the initial submittal of TR-12 have been <br />withdrawn (the pages will remain blank). All soils information revised by TR-12 <br />will be incorporated into section 2.05.4 Reclamation Plan. Tables have been <br />numbered and Table of Contents appropriately revised. <br />9. All constructively placed growth medium is referred to as soil in the revised text. <br />Collected field samples labeled "TS" infer constructively placed soils to be spread <br />over a base material. Samples labeled "S" refers to soils spread and sampled for <br />suitability and required soil enhancement. Samples labeled "SS" refer to a lower <br />soil horizon, or potentially substitute soil material should a limited azea be <br />partially deficient in soil coverage. <br />10. Subsoil #9 sample is missing the cover page. Please note that the Exhibit 22 <br />enclosed with this submittal includes both new and previously submitted data. <br />The data has been reorganized to better coordinate with Map 2.05.3-5 and Table <br />2.05.4-1f. Any missing pages have been included with this submittal. Previously <br />submitted pages maybe discarded. <br />11. Some Topsoil numbers on lab reports did not coincide with field notes, cross- <br />referenced area ID's submitted with the samples, and sample splits submitted to <br />an ancillary laboratory for additional analysis. <br />12. Samples numbered simply 1 (I-East, 1-West), 2 (Z-East, 2-West) and 3 refer to <br />the corresponding benches of Fill 9. These were the first Lorencito samples <br />collected; subsequent samples ID's became more complex, although perhaps not <br />always with more clarity. <br />13. Proposed soils lying outside of the suitable range will be dealt with on a case-by- <br />case base after Division consultation and approval. Statement has been added to <br />the text page 2.05-58. <br />14. An average of individual soil sample results have been calculated for several of <br />the areas designated by Map 2.05.3-5 <br />15. All revised text has been edited in an attempt to uniformly use present or future <br />tense as may be appropriate. <br />16. The requested revisions have been made with the understanding that any sampling <br />includes allowances for settling and normal variations in topsoil depths due to <br />