My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101408
DRMS
>
Back File Migration
>
Revision
>
REV101408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:56 AM
Creation date
11/22/2007 12:45:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977144
IBM Index Class Name
Revision
Doc Date
9/13/1989
From
MLRD
To
COLO QUARRIES INC
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pg. 3 <br />/;'d 1'',> Back f 1111ng in t• e areas can be done at toe oP slo• with waste <br />' ~ rock and tines to flatten slopes and construct gentle sloping bench areas on <br />West highwall and pit floor. Topsoil will be placed on upper benches on both <br />East and West highwall areas to achieve stronger plant growth. <br />p K (13.) Shown on maps <br />14.) Surface or ground water will not be affected in disturbed areas. Both <br />pit areas act as collection ponds for any run otf of slope areas. The only <br />surface drainage out of this area is along the access road. This area has <br />been affected in excess of SO years and as noted by the Soil Conservation <br />Service there is no erosion taking place. S~ ~l.~d r_~.s~cc~cnlleciioaand_ <br />sediment ponds will be constructed to correct such Upon completion of <br />f <br />mining, road will be left In place for access to property. Water bars will be <br />constructed as needed to prevent erosion in this area. <br />G~(15.) See New Wildlife Statement <br />(16.) Upon reviewing reclamation costs we have adjusted as such. <br />MOD -1-2 No Adjustment <br />MOD-3 No Adjustment <br />MOED-4 Additional $2,000.00 oversize and waste roc removal. ~ <br />PMD-5 No Adjustment <br />/ MOHW- I Final grading and contouring 3 days -D-8 caterpillar <br />tractor at $75.00 per hour 24 hours x $75.00 = $1,800.00. <br />Tap soiling bench and slope areas and seed bed preparation. 1 Truck at <br />$25.00 per hour 2 days - 16 hours x $25.00 hour = $400.00. <br />1-D6 Cat at $45.00 hour - 1 day 8 hours x $45.00 hour = $360.00. <br />MOEW-1 East highwall Final grading and sloping 3 days D-8 Cat at <br />$75.00 hour - 24 hours x $75.00 = $1,800.00 <br />Top soiling Bench and 51ope areas 1 Truck 3 days at $25.00 hour - 24 <br />hours x $25.00 = $600.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.