Laserfiche WebLink
Pg. 3 <br />/;'d 1'',> Back f 1111ng in t• e areas can be done at toe oP slo• with waste <br />' ~ rock and tines to flatten slopes and construct gentle sloping bench areas on <br />West highwall and pit floor. Topsoil will be placed on upper benches on both <br />East and West highwall areas to achieve stronger plant growth. <br />p K (13.) Shown on maps <br />14.) Surface or ground water will not be affected in disturbed areas. Both <br />pit areas act as collection ponds for any run otf of slope areas. The only <br />surface drainage out of this area is along the access road. This area has <br />been affected in excess of SO years and as noted by the Soil Conservation <br />Service there is no erosion taking place. S~ ~l.~d r_~.s~cc~cnlleciioaand_ <br />sediment ponds will be constructed to correct such Upon completion of <br />f <br />mining, road will be left In place for access to property. Water bars will be <br />constructed as needed to prevent erosion in this area. <br />G~(15.) See New Wildlife Statement <br />(16.) Upon reviewing reclamation costs we have adjusted as such. <br />MOD -1-2 No Adjustment <br />MOD-3 No Adjustment <br />MOED-4 Additional $2,000.00 oversize and waste roc removal. ~ <br />PMD-5 No Adjustment <br />/ MOHW- I Final grading and contouring 3 days -D-8 caterpillar <br />tractor at $75.00 per hour 24 hours x $75.00 = $1,800.00. <br />Tap soiling bench and slope areas and seed bed preparation. 1 Truck at <br />$25.00 per hour 2 days - 16 hours x $25.00 hour = $400.00. <br />1-D6 Cat at $45.00 hour - 1 day 8 hours x $45.00 hour = $360.00. <br />MOEW-1 East highwall Final grading and sloping 3 days D-8 Cat at <br />$75.00 hour - 24 hours x $75.00 = $1,800.00 <br />Top soiling Bench and 51ope areas 1 Truck 3 days at $25.00 hour - 24 <br />hours x $25.00 = $600.00. <br />