Laserfiche WebLink
HMS * Summary of Results <br />Project upland Run Name Rurt 12 <br />Start o1 Run 06Jun06 0100 Bealn Modal Upland Gravel SSLB <br />End of Run 07Jun06 0100 NeL. Hodel : 10-year storm <br />Execution Time 09JunD6 1318 Control Sp®ca COntr01 1 <br />Hydrologic Discharge Time pt Volume Drainage <br />Hlement Peak Peak (ac Area <br />(ets) tt) (sq mi) <br />Area 2A 3.1885 06 Jun 06 1310 0.18142 0 .013 <br />Plt Al 3.0266 06 JUn 06 1305 0.15090 0 .013 <br />Junction-1 5.6496 06 Jun 06 131D 0.33232 0 .026 <br />Pit lei Storage 0.0 06 Jun 06 OIOD 0.0 0 .026 <br />Pit p2 0.87156 06 Jun 06 1305 0.037813 0 .002 <br />Arse 2B 1.2612 06 Jun 06 1310 0.071759 0. 005 <br />JuectlOa-2 1.9135 06 Jun 06 1310 0.10957 0. 007 <br />Plt A2 Storage 0.0 06 Jun 06 0100 0.0 0. 007 <br />Aree 1 2.8586 06 Jun 06 1310 0.16916 0. 013 <br />