My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101325
DRMS
>
Back File Migration
>
Revision
>
REV101325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:50 AM
Creation date
11/22/2007 12:44:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
Revision
Doc Date
1/13/1994
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOUALY_PAODUCTION: • <br />Scraper CYCIe Time <br />Load - ` 0`9 min. <br />Maneuver d spread = 0.7 min. <br />Travel time (haul d return): <br />Haul route <br /> di <br />i <br />i <br />~ <br />Job Con <br />on Correct <br />rs <br />t <br />on <br />Site altitude = 6750 ft. <br />Alt. adjustment . . 0.94 <br />Job efficiency .. . 0.83 (lsh/d) <br />Net Correction 0.7802 <br />Rmad Length Grade Rolling Total Velocity Travel timex <br />seg. A (ft) res.(i) res.li) res.IZ) (fpm) (ein) <br />1 800 2.00 6.00 8.00 192 1.05 <br />Haul time = 1.05 min. <br />Return route """"""' <br />1 800 -2.00 6.00 4.00 2580 0.54 <br />{1st d last seg. adj. far accel./decel. Return time = 0.54 min. <br />Total CYCIe Time = 3.19 min. ; <br />"""' ~ Nachine Volume <br />Nachine Payload """"""" <br />"""""""` Struck capacity = N/A <br />Material Height = 2600.00 lbs/LCY Heaped capacity = 22.00 <br />Mat. description : """` <br />Clay d gravel - Net Average = 22.00 LCY <br />Rated payload = 50,000 lbs. Adjusted volume = 19.23 LCY <br />Payload volume = 19.23 LCY <br />Unadjusted production per scraper or push-pull pair 361.65 LCY/hr <br />Adjusted production 282.16 LCY/hr <br />Adjusted hourly fleet production 282.16 LCY/hr <br />JOB COST: <br />Fleet size : 1 Scraper(s) Total Job Time: 81.81 Hours <br />Unit Cost 50.434 /LCY Total Job Cost: 510,02D <br />
The URL can be used to link to this page
Your browser does not support the video tag.