Laserfiche WebLink
RECLANATIUN~ SUMMARY cont'd ~et 3 of 4 <br />N. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.. Task Description ; Cost ltl <br />NA ~ No streae channel reconstruction cork required . ' <br />Subtotal (H): <br />------------ <br />I. EARTHRORK -SEDIMENT POND/DIVERSION DITCH/CHECK DAN REHOVAL <br />Task No.. Task Description ~ Cost Itl <br />NA ` .All drainage control structures are associated ` <br />with permanent concrete plant facility outside <br />permitted area. <br />, <br />, <br />, <br />Subtotal (11: <br />------------ <br />J. EAATHIIORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.. Task Description ~ Cost (S) <br />3 ~ Replace 4-6' laver of topsoil over phase 1 thru 71 510,020 <br />disturbed areas. <br />, <br />, , <br />, <br />, <br />Subtotal IJ): 510,020 <br />