Laserfiche WebLink
~lorado Division of Minerals and 6eologv ~ sheet 1 of 2 <br />ESTIMATING FORM -EAUIPNENT NOBILI2ATION / DEHOBILI2ATIOH <br />--------------------------------------------------------- <br />--------------------------------------------------------- <br />Task 5... 6 Prep. by TD6 Filename..M03B-6 <br />Date..... 13-Jan-94 Permit 5 N-87-038 Nine......Bayfield Pit No. 1 <br />Permit Action........ Permit Amendment No. AN002 -add phases 5, 6, d 1 <br />Task Description..... Haul reclamation equipment to 6 from job site <br />HOURLY EAUIPNENT COST <br />- - - NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor : 6z4, 75,000 lb GVN, 315 HP, diesel poxered <br /> -Lt. Trailer 25 tan folding gooseneck, drop deck <br /> -Ned. Trailer : 50 ton folding gooseneck, drop deck <br /> -Hvy. frailer : 120 Ton folding gooseneck, drop deck <br /> -Pilot Car : On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane Grove AT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br /> -Fuel Truck : 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Cube Truck 6z4, 2,SD0 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb GVN, l75 HP, diesel poxered <br />Last UPdate: .......................................... ........................................... <br />Hay, 1991 <br />"""""""` Lt. Rig Med.Aig Nvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: (=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />------------- <br />Oxnership -------- <br />Cost/hr ---------- <br />= 126.18 ------------------------------- <br />129.16 137.74 11.39 --------- <br />119.89 --------------- <br />16.02 ---------------- <br />510.66 --------- <br />f6.70 <br />Operating Cost/hr = 523.23 524.76 529.92 54.05 523.40 516.19 520.71 17.47 <br />Operatmr Cost/hr = 520.54 520.54 520.54 519.81 520.86 519.97 519.97 (19.97 <br />Helper Cost/hr = 519.81 <br />------- 519.81 519. B1 10.00 <br />------- ------- ------- 50.00 <br />------- 50.00 <br />------- 50.00 <br />------- 50.00 <br />------- <br /> Total = 190.36 594.27 5108.01 525.25 564.15 542.18 551.34 134.14 <br />NON-ROADABLE EAUIPNENT: <br />""""""""""" Neight Ownership Haul Aig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons! Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />-------------------------------------------------- --------------------------------------------------------------- <br />Cat D8N Dozer w/SU el. 6 ripper 39.50 144.36 594.27 1 1138.63 594.27 <br />Cat 623E Elevating Scraper 31.15 S43.B3 594.27 1 !138.10 594.27 <br />Reveg. Equip. - initial seeding 15.00 520.00 590.36 <br />Reveg. Equip. -failure seeding 15.00 520.00 590.36 <br />5110.36 540.36 <br />5110.36 590.36 <br />-------------------------------------------------------------------------------------------------------------------- <br />Subtmtals : t497.45 1364.26 10.00 <br />