Laserfiche WebLink
<br /> <br />DATB REVISION DESCRIPI70N OF CHANGE TO CONDI'nONS <br />APPROVED NUMBER REVISION BOND COMPLIED WTTN <br /> LIABiLr1Y <br />8-16-89 TR-10 Construction of new 0 Stipula-lions 1 <br /> haul road (see slip- & 2 attached. <br /> ulations) Never built. <br />10-17-88 TR-11 .Construction of 7N $5,410 <br /> Angle dewatering (Operator <br /> well and ditch 9-D14 estimate for <br /> well) <br />11-1-88 TR-12 To discontinue 0 <br /> subsidence <br /> monitoring of No. 5 <br /> mine <br />6-6-89 TR-13 Construction of + <br /> multiple service $51,167 <br /> building and 100,000 <br /> gallon water storage <br /> tank <br />6-26-89 TR-14 Change in design of 0 <br /> drainage ditches for <br /> coal waste pile <br />11-14-89 TR-15 Revision of 0 <br /> revegetation <br /> monitoring plan and <br /> methodology <br />5-22-90 TR-16 Sedcad reevaluation 0 Stipulation <br /> of all ditches and #3: <br /> culverts, elimination Containment <br /> of pond HR-P3; new berm built. <br /> small area Operator to <br /> exemption remove coal <br /> quarterly <br /> <br />