My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101150
DRMS
>
Back File Migration
>
Revision
>
REV101150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:40 AM
Creation date
11/22/2007 12:43:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/25/2006
Doc Name
Proposed Decision Letter & Form
From
DMG
To
Snowcap Coal Company, Inc.
Type & Sequence
TR50
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 C O L D ItA D O <br />Denver, Colorado 80203 DIVISION o r <br />MIN <br />RAL S <br />Phone: (303) 8663567 E <br />FAX: (303) 832.8106 G E O L O G Y <br /> RECLANATION•NINING <br /> EAFETY•ECIENCE <br /> Bill Owens <br />July 25, 2006 covemnr <br /> Russell George <br /> <br />Tonya Hammond Executive Director <br /> <br />Snowcap Coal Company, Inc. Ronald W. Cavany <br />Division DirecTOr <br />P.O. Box 1430 Natural Resource Trustee <br />Palisade, CO 81526 <br />Re: Roadside Portals (Permit No. C-1981-041) <br />Proposed Decision -Technical Revision No. 50 (TR-50) <br />Discontinue Spring & Seep Monitoring <br />Dear Ms. Hammond: <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 50 at the Roadside Portals. Notice of the proposed decision will be published in the The Daily <br />Sentinel as soon as possible. The first publication will initiate the ten (10) day public comment period for <br />the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision Form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />o~ <br />Environmental Protection Specialist <br />DTM/Ahd <br />Enclosure <br />ca Carl .Tohnctnp, Office of 4nrface Mining, with enclocurec <br />M:r~emp\GTR-06_C1981041_DTM_20060725_22012 PM.doc Office of Colorado <br />Mined Land Reclamation Active and Inanive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.