Laserfiche WebLink
i <br />Technical Revision Permit # M-1981-277 <br />Reclamation Ptan <br />a. This additional area will be filled to match the level of the existing <br />roadway by moving the piles of overburden and waste rock with a <br />cat and trucks. <br />b. This area is being reclaimed as part of this technical revision. <br />c. We will complete the filling of the area on the first phase. <br />d. After the area is no longer used it will be reseeded with the mix <br />specified in the original permit. <br />e. Chisel 8 harrow and application of seed, fertilization and topsoil <br />will be completed as specified in the original permit when operations <br />cease. <br />Tractor time for spreading topsoil and fertilizer <br />6 acres x 1 hr per acre x $50 hr = $300 <br />Tractor time for surface prep 6 acres x .5 hr per acre x $50 hr = $150 <br />Hand application of seed mix 6 acres x 1 hr per acre x $50 hr = $300 <br />Estimated Total Costs = $750 <br />