My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV101027
DRMS
>
Back File Migration
>
Revision
>
REV101027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:31 AM
Creation date
11/22/2007 12:42:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
12/16/1991
Doc Name
PN C-80-007 TR 61 GOB PLACEMENT IN STACK TUBE AREA FILL
From
MTN COAL CO
To
CMLRD
Type & Sequence
TR61
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ti :P1=_.-JU: bLO'•~t-1 GUt Dtll I.I. 11 ~~I 1:' 4~1 f. V1 <br />GEOWCST <br />Golden, Inc. <br />December 11, 1991 <br />Ms. Cathy Welt <br />Mountain Coal Company <br />West Elk Mine <br />P. O. Box 591 <br />Somerset, CO 81434 <br />RE: SLOPE STABILITY ANALYSIS -STACK TUBE PROJECT <br />Dear Cathy: <br />A slope stability analysis was performed on the critical section for the stack tube <br />project. This critical section is located on Ilse western edge of the project site where <br />the till required for this project is approximately 40 feet in height. The use of coal <br />refuse or "gob" as a fill material was modelled in this analysis. Shear strength parameters for all <br />materials were based on previous sl~eal tests on samples similar in nature to the stack kube soils <br />for other projects for Mountain Coal Company. For the analysis, we assumed the stack tube site <br />was filled with coal to its designed maximum height. <br />The results of the stability analysis showed tl\at a minimum 50-foot wedge of native clay fill material <br />on the outside edge must be used for this project to meet the minimum (actor of safety <br />requirements found in the CMLR general grading requirements 4.14.2 (2) (c). The results of the <br />stability analysis are shown on Figure 1. <br />If you have any questions concerning this analysis, please feel tree to give me a call. <br />Slncereiy, <br />Geo 1 Gol Inc. <br />Charles C. Refm <br />Project Manager <br />9115.01 \c o r1115 s s e.l I r <br />First Commerce Cenlcr, Sulle 20116 175 «'csl I00 Rnnlh Snll lake (71 y, Ulnh A4111 (A01) 359-1059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.