My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100888
DRMS
>
Back File Migration
>
Revision
>
REV100888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:23 AM
Creation date
11/22/2007 12:40:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
12/4/2000
Doc Name
RESPONSE TO ORDER TO REVISE PERMIT TR 53 DESERADO MINE PN C-80-018
From
BLUE MOUNTAIN ENERGY INC
To
DMG
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />d.) The design and demonstration for sediment control of the active azea of the Halandras <br />Landfill are attached. <br />e.) The sediment controls for the Transfer Stations will be reviewed and appropriate <br />modifications made as part of the next submittal. <br />£) Appropriate modifications to Map 147 will be included in the next submittal. <br />g.) Settleable solids limitations demonstrations -Illustration 44: <br />^ B vent shaft, RS shafts, Rock Dust Shafrs -These `shaft' site azeas conform to <br />the SAE demonstrations as shown in Illustration 44 - "Typical Degasitication <br />Borehole Pads" to control sediment. The title page to [his demonstration has been <br />amended to specifically identify these locations as being covered by this <br />demonstration. <br />^ Sediment control for the staging/laydown area immediately west of Slot Storage <br />is controlled by sediment pond SS-2. Calculations for this pond are provided in <br />Illustration 39 (referred to as Pond 1). <br />• Settleable solids demonstrations for other staging/laydown areas northwest of <br />Transfer Station #1 and between the railroad loop and slot storage are attached for <br />inclusion in Illustration 44. Similaz demonstrations for the staging/laydown <br />within the railroad loop, northeast of Slot Storage, and at the County Road <br />65/haul road intersection will be addressed in the next submittal. <br />Other issues <br />a.) Remove Illustration 11 -County Road Scullion Gulch Culvert Design Calculations. This <br />is not part of our mining pennit and should be removed. <br />b.) Remove Illustration 12 -Ventilation Entry Area Ditch and Culvert Design Calculations. <br />More current information is contained in Illustration 44. <br />c.} Remove Illustration 28 -Drainage Control/Station 7+43/County Road 65. More current <br />information is contained in Illustration 44. <br />d.} Remove Illustration 41 -Sediment Control Calculations -Material Storage at East <br />Intakes. More current information is contained in Illustration 44. <br />e.) Railroad Loop Maintenance Access Road culvert -Map 112 has been modified to show <br />an 8" CMP where this road crosses a drainage. SedCad culvert sizing calculations are <br />enclosed to support this design. <br />£) A SAE demonstration is being provided which specifically addresses the topsoil stockpile <br />northwest of Slot Storage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.