Laserfiche WebLink
<br /> <br />infestation is encountered, it will be buried as overburden rather than used as a growth <br />medium. <br />STOCKPILE, PROCESS, & STAGING AREA -Once all of the mineral resource has been <br />removed from this area, it will be used as some type of industrial activity. Such as, outdoor <br />storage of construction equipment and supplies. Since the site, in its current state, is well <br />graded, modification to the existing conditions will not be attempted. Enough gravel will <br />be salvaged from the resource stockpiles to cover the entire ground surface within the area <br />with 4 to 6 inches of material . <br />HAUL ROADS -Other than graveling, no changes are anticipated to the primary haul <br />route. The two alternate haul routes will be graded and seeded in accordance with the <br />procedure previously outlined for the extraction area outside the top of the pit slopes. <br />Seeding of the alternate haul routes will be limited to between the stockpile area and the <br />edge of the disturbed extraction area. <br />Rcv. rv/rs/f7 <br />