My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100824
DRMS
>
Back File Migration
>
Revision
>
REV100824
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:11:19 AM
Creation date
11/22/2007 12:39:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/27/1998
Doc Name
TR 26 ROADSIDE NORTH AND SOUTH MINES PN C-81-041
From
DMG
To
DAN MATHEWS
Type & Sequence
TR26
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiinii~iii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Dc•parlmenl of Natural Resources <br />1 31 3 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone U031866-3567 <br />FAX: 130 31 832-81 Oh <br />Date: July 27, 1998 <br />To: Dan Mathews <br />From: David Berry <br />Re: Technical Revision No. 26 -Roadside North and South Mines - <br />Permit No. C-81-041 <br />~I~~~ <br />DerARTM>=tvr of <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />James s. Lochhead <br />Execuvve Dueciar <br />Michael B. Long <br />Division Duecmr <br />I have reviewed the surface water aspects of the above-referenced technical revision. The initial <br />review indicated that the triangular ditch portion of the Guard Shack Ditch was not designed to <br />incorporate the required 0.3 feet vertical freeboard. Mr. Balaz was contacted with this concern, <br />and he provided a revised plan, which incorporates a 25 inch berm to accommodate the <br />requirement. <br />The surface water aspects of this proposal are adequate with the submittal of the diagram and <br />cover letter dated July 21, 1998, received in Denver on July 24, 1998. <br />You may want to advise the operator that the provided designs are approved with the <br />understanding that the operator must ensure that the designs are implemented to perform in the <br />field to contain all disturbed area flow from the ]0 year, 24 hour storm event. <br />M~.~o:533rcUC6dabmo <br />.~., <br />
The URL can be used to link to this page
Your browser does not support the video tag.