Laserfiche WebLink
COST CALCULATIONS <br />Backtilline <br />300 yazds per acre <br />2 hours, dozer @ $135/hr. $270 <br />Replacement of Topsoil <br />750 yazds per acre <br />3 hours, scraper @ $165lhr. $495 <br />Final GradinE <br />Grader 3 hours @ $75/hr. $225 <br />Fertilizer <br />100 pounds/acre @ $2.25/lb. $225 <br />Tilline <br />1 hour at $75/hr. <br />$75 <br />Seed <br />15 pounds PLS/acre @ $11/lb. $165 <br />Mulch <br />30001b./acre @ $4.25/SOIb. $255 <br />