Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :OMG <br />004 State :Colorado <br />12/08/2005 County:Ladmer <br />ESC <br />Site :WagnedKauHman Pif #3 <br />Permit or otherjob action :Am-01 <br />Task description :place and Compact Liner in Thin Lifts <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper <br />-Push dozer <br />Cost Bre <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-W ater truck <br />ipment Description <br />827G <br />"815F <br />-14H <br />er Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA compact grader mischuk <br />°k Utilization-machine : 100 NA NA 100 100 100 <br />-Ripper attachment : NA NA NA NA 20 NA <br />Ownerhip cosUhaur : $46.97 NA NA $4773 $40.73 $23.89 <br />OperatingcosUhour: $132.39 NA NA $48.78 $48.04 $42.61 <br />Ripper op.costlhour: NA NA NA NA $0.90 $0.00 <br />Operator cost/hour : $32.72 NA NA $31.78 $32.90 $33.68 <br />Unit subtotals : $212.08 NA NA $128.29 $122.57 $100.17 <br />Number of units : 3 0 0 2 1 1 <br />Group subtotals : Work : $636.23 Support : $256.57 Maintenance : $222.74 <br />Total work team cosf/hour : 61,115.55 <br />Initial Swell Loose <br />volume : 210,000 LCY factor : NA volume : 210,000 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :NA <br />Permitfjab # : M-1999-069 <br />Abbreviation :none <br />Filename :M089-004 <br />