Laserfiche WebLink
<br />ANACONDA MlnP:als Company <br />555 Seventeenth Street <br />Denver, Colorado 80202 <br />Telephone 303 293 4000 <br />June 12, 1985 <br />Ms. Susan Mowr,~ <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Susan: <br />~~~~~~~~ <br />~ U N 1 3 1985 <br /> <br />MINED LAND <br />RECLAMATION DIVISION <br />West Elk Coal Company (WECC) requests the following minor modifications to <br />the Mt. Gunnison Mining and Reclamation Plan (Permit C-007-80). <br />1. .As shown on the attached map, WECC is proposing to construct a small <br />parking area adjacent to the fresh water pond. This area, approximately <br />100 feet by 100 feet in dimension, will be constructed on a previously <br />disturbed area. The area will be graded, covered with a filter fabric <br />to minimize erosion and then covered with a minimum of six inches of <br />gravel. <br />Drainage for this area is to the drainage ditch on the inside of the <br />road to the fresh water pond and on into the main access road drainage <br />ditch which in turn drains into Sedimentation Pond MB #2. Since the <br />area has been previously stripped of topsoil, no topsoil removal is <br />necessary. Reclamation of the parking lot will be done at the time the <br />surface facility area is reclaimed or before, and will be done in <br />accordance with Section 4.4 of the Mt. Gunnison M and R Plan. <br />Reclamation of this area is covered by the present reclamation bond <br />since it is within the current surface facilities area. <br />2. WECC is proposing to centralize its non-coal refuse disposal. At <br />present there are dumpsters located around the site. Our proposal is to <br />locate two to four dumpsters at the location shown on the attached map <br />and eliminate the dumpsters on the portal bench. This dumpster area, <br />adjacent to the mine's main access road, between the portal bench and <br />the water tank has been previously disturbed and all vegetation and <br />topsoil removed. To access the site, vehicles will enter from the main <br />access road, cross the drainage ditch to the dumpster site. A 24-inch <br />CMP culvert will be installed to maintain drainage in the ditch. Like <br />the parking site, reclamation of the dumpster site will be done at the <br />time the surface facilities area is reclaimed and will be done in <br />accordance with Section 4.4 of the M and R Plan. Reclamation of this <br />area is covered by the current reclamation bond since it is within the <br />current surface facilities area. <br />If you have any additional questions, please do not hesitate to contact me. <br />S ely, <br />Paige B. Seville <br />Senior Permits Coordinator <br />cc: Rocky Bowman/Bill Wagener <br />f NiCON01 Min e•.N Com pant N d [lin uon of 4ii. nb!B q1, 1~lIp COm pa ny <br />•uC0-60004 I6~b J~ <br />