Laserfiche WebLink
Colorado Departrnent of Public Health and Environmem <br />Air Pollution Control Division Page 4 of 6 <br />- MINING OPERATIONS - <br />L PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? es No <br />NOTE: ALL PROCESS EQUIP!VIENT REQUIRES A SEPARATE PERNllT APPLICATION AND ADEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed par year: ~~p, IK~J <br />Maximum tons crushed per hour. 2.S ~' <br />Hours of crushing per day: /p <br />Proposed Controls: <br />^ Moist Material <br />® Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crushed per year: /p~; O~'c9 <br />Maximum tons crushed per hour: 2 5'C' <br />Hours of cnuhing per day: /p <br />Proposed Controls: <br />^ Moist Material <br />® Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />J. <br />RESCREEtNING~+CLASSQ~YIlNG <br />Tons Maximum tons screened per year: /pC, cNC Tons <br />Tons Maximum tons screened per hour: aSG~ Tons <br />Hours of screening per day: /~ <br />Proposed Controls: <br />^ Moist Material <br />® Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />Tons Of Material Conveyed Per Year ~OL~ p~?C Tons. <br />Tons Of Material Conveyed Per Day 2Sao Tons. <br />Proposed Controls <br />^ Enclosure Type: <br />^ Other (specify) <br />Number Of Transfer Points <br />Proposed Controls <br />^ Enclosure Type: <br />^ Water Spray <br />^ Chemical Stabilizer <br />^ Other (specify) <br />.Q' <br />(Indicate On A Separate Diagram How Conveyor System TH Set Up) <br />Tons <br />Tons <br />Maximum tons screened per year: <br />Maximum tons screened per hour: <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />® Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />{Complete or Partial) <br />(Complete or Partial) <br />/a~ a~~ <br />~'c? <br />IC' <br />Tons <br />Tons <br />Revised July 2001 h~tp://www.cdohe.state.co us/ao/stationary aso <br />