Laserfiche WebLink
<br />Topsoil will be removed to a minimum depth of approximately <br />six inches (6") where available. Topaoil will be stockpiled <br />around the perimeter of the pit in such a manner as to pre- <br />vent any erosion. It is hoped that in later stages of <br />development of the pit that topsoils can be stripped from <br />proposed mining areas and placed directly on areas where min- <br />ing operations have been completed. <br />