Laserfiche WebLink
<br />~- <br />DIVISION OF MINERALS AND GEOLOGY Apa ~ ~ I~{~6 <br />Depanmenl of Natural Resources <br />1313 Sherman 51.. Room 215 I+Y~~ <br />Denver, Colorado 80203 tlWA®Y II <br />Phone: (303) 866-3567 <br />FAX: 13031 832-8106 (~IVVGIdII Ui I~u11BI21b h <br />CONSTRIICTION lIATERIAL DEPARTMEM' OF <br />REGIILAR 112 OPERATION NATURAL <br />RESOURCES <br />RECLA2SATION PERMIT APPLICATION PACKAGE <br />Roy Romer <br />Governor <br />lames 5. lochhead <br />Executive Director <br />APPLICABILITY: Michael s tong <br />Division Director <br />This application package is for a construction materials operation which affects <br />10 acres or more. If you plan to conduct a construction materials extraction <br />operation which meets these criteria, please follow the instructions provided in <br />this package, in the Rules and Regulations, and in the Colorado Land Reclamation <br />Act for the Extraction of Construction Materials, as required. <br />RECOMMENDATIONS PRIOR TO FILING: <br />The Construction Material Rules and Regulations (the Colorado Land Reclamation <br />Act for the Extraction of Construction Materials, Section 34-32.5-101, et sect., <br />C.R.S., and 2 CCR 407-1) and the Colorado Mined Land Reclamation Board (the <br />"Board") regulate the permitting, operational and reclamation requirements for <br />all construction material extraction operations in Colorado. It is your <br />obligation to comply with the Act and Regulations. You are encouraged to obtain <br />and review a copy of the Rules, available for $8.00 from the Division of Minerals <br />and Geology (the "Office"). In order to submit your application properly, it is <br />recommended that you review the Act and: <br />Rule 1.1 Definitions; <br />Rule 1.4.1 Application Review and Consideration Process; <br />Rule 1.4.5 Specific Requirements for Regular 112 Operations; <br />Rule 1.6 Public Notice Procedures; <br />Rule 3.1 Reclamation Performance Standards; <br />Rule 3.3.1 Operating without a Permit - Penalty; <br />Rule 4 Performance Warranties and Financial Warranties; <br />Rule 6 Permit Application Exhibit Requirements; <br />Rule 6.2 General Requirements of Exhibits; <br />Rule 6.4 Specific Permit Application Exhibit Requirements; and <br />Rule 6.5 Geotechnical Stability Exhibit. <br />• • III IIIIIIIIIIIII III <br />