Laserfiche WebLink
Additional activities at the mine site have included management of the reclaimed azeas, <br />maintenance of the surface water control facilities, monitoring, and ash disposal. <br />Descriation of Bond Release Amount Request: This bond release request comprises a <br />request for Phase I bond release for areas which have been successfully backfilled and <br />graded with establishment of attendant surface drainage. <br />Coors Energy Company is requesting sixty percent of the applicable reclamation bond be <br />released for the areas which have been successfully backfilled, regraded and drainage <br />established in accordance with the approved reclamation plan. As demonstration of <br />compliance with the approved plan for backfilling and grading, apost-mining topographic <br />map is provided which identifies the actual post-mining topography. <br />Based on the mapping, backfilled topography, and field observations, the designated azeas <br />of the Keenesburg Mine are eligible for Phase I bond release. <br />Notice to Parties Identified in Rule 3.03.2(1): Please see attached copies of letters and <br />certified receipt notices sent to specified parties. <br />Newsoaner Advertisement: A copy of the newspaper advertisement published in the <br />New News is attached. Proof of publication of the notice for the required period of time <br />is also included. <br />3 <br />