My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100500
DRMS
>
Back File Migration
>
Revision
>
REV100500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:59 AM
Creation date
11/22/2007 12:36:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
7/30/1998
Doc Name
HENDERSON MILL COHEREX STATION UPGRADE PN M-77-342
From
DMG
To
CLIMAX MOLYBDENUM CO
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII i <br />999 <br />• <br />STATE OF COLOlZADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DcPanmcnl ul Nal oral Kr'snu r[rc <br />1 } I { 5hennpn 51.. Krum 21 5 <br />Dcnerr, GJnr.ldo Hn'O1 <br />Phunr: r Si751 H6L 156,' <br />Fnh ilry ;i Hl!-9101, <br />July 30, 1998 <br />Mr. Erich Bower <br />Climax Molybdenum Company <br />19302 County Road #3 <br />Parshall, CO 80468 <br />RE: Henderson Mill Coherex Station Upgrade, Permit No. M-77-342 <br />Dear Mr. Bower: <br />DEPARTMEYT OE <br />NATURAL <br />RESOURCES <br />Ruy Fnr..er <br />Gurernnr <br />dames 5. LnchhraJ <br />C ~PCUnpw DI!/r~Jr <br />Michael B Lung <br />Dw~isian Uireanr <br />The Division has completed a review of your letter and attachments dated July 20, 1998 providing infotmation on the <br />Coherex station upgrade proposed for the Henderson Mill. Since Coherex is listed as a designated chemical in the <br />pending Environmental Protection Plan for the Henderson Mine and Mill, the Coherex station upgrade is subject [o <br />the environmental protection facilities design and construction requirements and the certification and inspection <br />requirements of Rules 7.3 and 7.4 of the Hard Rock/Metal Mining Rules of [he Mined Land Reclamation Board. <br />Based on the design information submitted in your July 20, 1998 letter, the Division hereby issues approval to <br />proceed with the demolition of the existing Coherex station and excavation of contaminated soils. Prior to disposal of <br />excavated soils or backfilling of the excavation, the following information must be provided for review by [he <br />Division: <br />What type of testing will be conducted to determine the limit of the contaminated soils to be excavated? <br />What contaminant concentration criteria will be applied to define the limit of the soil contamination? <br />2. Provide a disposal plan for the Coherex-contaminated soils. <br />Once the preceding issues have been addressed to the Division's satisfaction, the remainder of the project may <br />proceed in accordance with the plan provided. Prior [o filling [he new Coherex tanks, Climax Ivtolybdenum Company <br />must provide a certified verification by a professional engineer or other qualified individual that will confirm that the <br />facility was constructed in accordance with the approved design plan, and the Division must accept this certification <br />in writing. In accordance with Rule 7.4, [he Division may schedule an inspection of the Coherex station excavation <br />depending on [he nature your responses [o item no. I listed above. If such an inspection is scheduled, [he excavation <br />may nat be backfilled until the inspection has been conducted and the Division has issued authorization to proceed <br />(Rule 7.3. I (I )). <br />If you have any questions, please contact me. <br />Sincerely, <br />vG~~~ . <br />Allen C. Sorenson <br />Reclamation Specialist <br />C.1wi nJnwslpersono 1lhendeh n.Juc <br />
The URL can be used to link to this page
Your browser does not support the video tag.