My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100448
DRMS
>
Back File Migration
>
Revision
>
REV100448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:55 AM
Creation date
11/22/2007 12:36:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
7/22/2002
Doc Name
Letter regarding Response to Adequacy Review Comments
From
Seneca Coal Company
To
DMG
Type & Sequence
TR35
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Miehael Boulay <br />Division of Minemb and Geology <br />]uly 77, 2001 <br />Page 3 <br />Once SCC had determined which impoundmenu will remain as permanent featury the Division will conduct a <br />field inrpectian to veri~ the adeguary of the rafety demonrtratian provided Pleare note that the rafety <br />demonrtration war nat signed, and rhould be rigned by apmferrianal engineer. The waiver alto needy to include a <br />pmvirion that tbeyearly inrpectian referenced in Rule 4.05.9 ~14~ ,may be conducted by a gual~ed Perron other <br />than, and mot under the direction of, a proferriona! engineer [Rule 4.05.0 (18J (cfJ. <br />Response: As stated in the pervious comment response, SCC has indicated which ponds will remain as <br />permanent. So again, at this point in time in accordance with Rule 4.05.9(18), SCC is requesting a <br />waiver from Rule 4.05.9(17] for all the permanent stock ponds within the Seneca II pemtit azea. SCC <br />respectfully requests that the inspection frequenry for the existing stock ponds be reduced from <br />quarterly to annually. In addition, a qualified person will complete the inspections. <br />Given the relatively small size and location none of the stock ponds create a threat to public health and <br />safety or threaten significant environmental harm. The existing stock ponds ate constructed in <br />reclaimed azeas and do not serve as primary sediment control structures. Each stock pond has a storage <br />capacity no greater than two-acre feet and embankment no greater than 5 feet high measured from the <br />invert of the spillway to the upstream toe of the embankment. <br />As part of this waiver request, a Stock Pond Hazard Evaluation conducted by MWH is attached in <br />accordance with Rule 4.05.9(] 8(b). <br />The Stock Pond Hazard Evaluation has been signed and certified and is included as pazt of Appendix <br />13-9. Therefore, SCC requests the Division review the waiver request. A list of the proposed <br />permanent stock ponds is presented in response to Comment la. <br />Comment Id.• Once it hat been determined which impaundmentr will be retained as permanent, the Portmining <br />Drainage Contra! Map, Exhibit 7-19 and the Port Mine Contour Map, Exhibit 12-9 rhould be revised to <br />include there permanent features. Na further response it necesrary at thi r time. <br />Response: The Postmining Drainage Control Map (Exhibit 7-19) has been revised to show the <br />locations of the permanent stock ponds. SCC antidpates some final revisions for Exhibit 12-9, Post <br />Mine Contour Map, in the near future. At that time SCC will add the locations of the permanent <br />stock ponds to the Exhibit 72-9. <br />Should you or any other members of the Division have questions regazding this information, please <br />don't hesitate to contact me at (970) 236-5106. <br />S' erely, <br />Robert J. Shevling, P.E., P.G. <br />Engineering Manager <br />Seneca Coal Company <br />enclosure(s) <br />cc: John Husband (BI.M) <br />Cazl Johnston (OSMRE) <br />®:mv/Socgren/rxir/wq.~ M~G....,. <br />,s,uae~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.