My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100447
DRMS
>
Back File Migration
>
Revision
>
REV100447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:55 AM
Creation date
11/22/2007 12:36:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
1/26/2000
Doc Name
WEST ELK MINE PN C-1980-007 PROPOSED DECISION PR APP 8 PR-8
From
DMG
To
MOUNTAIN COAL CO LLC
Type & Sequence
PR8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III Illllllllllll III <br />STATE OF CO~U19~UU <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman 51., Roam 215 <br />Denver, Colorado 80203 <br />Phone: (7031 866-3567 <br />FAa: (3031 812-8106 <br />January 26, 2000 <br />Christine E. Johnston <br />Mountain Coal Company, LLC. <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Re: West Elk Mine (Permit No. C-1980-007) <br />Proposed Decision <br />Permit Revision Application No. 8 (PR-8) <br />Dear Ms. Johnston: <br />~~ <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />MINING•SAFETY <br />811 Owens <br />Governor <br />Greg E. Walther <br />Enecwrve Direcbr <br />Michael B Long <br />Division Direnar <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision Package for Permit Revision <br />No. 8 at the West Elk Mine. Notice of the proposed decision will be published in the Della County Independent as <br />soon as possible. The first publication will initiate the thirty (30) day public comment period for the Division's <br />decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application <br />was sent to the Office of Surface Mining and the Bureau of Land Management. The material should be sent within <br />15 days of final approval. <br />Please be advised that federal mine plan approval needs to be obtained from the Office of Surface Mining <br />Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, is required, before <br />operations affecting federal coal may commence. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. The revision will not be final until the bond is approved by the Division. <br />[f you have any questions, please contact me. <br />Sincerely, <br />1~ im R. Burnell <br />Environmental Protection Specialist <br />]RB/Jrc <br />Enclosure(s) <br />C-PR-0B C1980007 1RB 20000126 IOi92i AM dac <br />
The URL can be used to link to this page
Your browser does not support the video tag.