Laserfiche WebLink
~ III IIIIIIIIIIIIIIII <br />Received <br />MAY 2 a ?ACC <br />purango Field Ottico <br />pNfsion of Minerals & Geology <br />Divi;~ion of Minerals and Geology <br />Dep:urtrnent of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Co 80203 <br />Re: ].12 c Permit #M-1987-088 <br />• <br />Ted R Hubbs Family Trust <br />Barbara E. Hubbs Trustee <br />7994 E Saddleback Drive <br />Kingman, Arizona 86401 <br />May 19, 2000 <br />~FCFI ° ~ ~ .~ f' ~ y=in ;:. <br />or,; on Y3020p ~;`:=il_;~ E~li_~: ~t;'~e <br />Operation: Hubbs Pit <br />Laplata County, Colorado <br />I request two revisions be done to the original permit plan as follows: <br />1. It states that the pit floor in Phase I and Phase II be reclaimed prior <br />to going to Phase III. I would like this changed so we can utilize <br />the pit floor for stockpiling materials while completing Phase II <br />and the lower part of Phase N. There is a great need for more <br />storage space. The way the road comes down into the pit area it <br />crosses over Phase I. Once these are completed we will reclaim <br />the pit floor as a feeding area for cattle. <br />2. The oil pipeline was removed from Phase II with the permission of <br />Williford Energy Company. A steel storage tank was placed into <br />service. The oil pipeline was blown out and disconnected by <br />Williford employees. This was done prior to excavation. I failed <br />to notify you. <br />I hope you take in consideration for the revision I have requested. I have <br />consiilted with Steve Shuey and Laplata County Road and Bridge <br />Department to whom has the lease, of these revisions. <br />Sincerely~~~ ~~b~-~~ <br />/7 <br />Barbera E. Hubbs <br />520-692-6208 `r~,,, <br />e ~ -~~. 1 _'_ "~- <br />