Laserfiche WebLink
Ms. Welt <br />Page 8 <br />multiple stipulations. Mr. Hayes also states that MCC's response <br />is acceptable and terminates the stipulation. It would be helpful <br />if MCC could assist the Division in tracking down MCC's response. <br />16. Stipulation 42 imposed as part of Technical Revision 58, <br />requires that information submitted with the technical revision be <br />incorporated into the new reorganized permit. All this material <br />has not been included in the permit. In order to fully comply with <br />this stipulation MCC should submit: a map which shows the location <br />of the clean water ditches, sediment ditches, and sediment trap and <br />culverts; contours of the storage pad; and information regarding <br />the identity of the fill used as part of the pad construction. If <br />gob was used, please specify how much of the fill is gob. Also, <br />provide final maps for the preliminary maps submitted with TR 58. <br />MCC may wish to add the information related to drainage control on <br />the drainage control map. <br />Responses to these items will be handled as a minor revision <br />because the Division has determined that the information requested <br />is for clarification and other minor additions to the permit <br />document. Once this minor revision has been resolved, the Division <br />can issue a renewed permit. <br />If you have any questions, please call. <br />erely, <br />~'~ <br />Christine E. Jo ston <br />Reclamation Spe ialist <br />WERN1 <br />