Laserfiche WebLink
(~ C• le Creek & Victor Gold Mining Coany <br />~;(~~~ '~ f A Joint Venture - ANGLOGOLD (Colorado) CORP.. Manager <br />~.5. ~~' <br />CYANIDE CONTAINMENT POLICY <br />Policy: SOLUTIONS CONTAINING CYANIDE SHALL BE CONTAINED WITHIN THE <br />VALLEY LEACH FACILITY, ADR BUILDING AND THE ASSOCIATED TANKS, <br />EXTERNAL STORAGE POND(S), AND ALL INTERCONNECTING PIPELINES. <br />NECESSARY PROCEDURES SHALL BE FOLLOWED TO PREVENT THE RELEASE <br />OF CYANIDE. <br />Lnplementation: <br />Design, construction, operation, and maintenance of the process components involving cyanide <br />will adhere to the Cyanide Containment Policy. Any action or reaction undertaken by a CC&V <br />Team Member will not occur until the potential effect on cyanide containment is assessed. <br />Education: <br />This Policy will be distributed to all CC&V Team Members and will be specifically addressed in <br />new miner and annual refresher training. <br />All Team Members with access to the cyanide containment system (VLF, ADR, External Pond) <br />will be required to know the general cyanide containment features of the facilities in order that <br />they will not compromise (adversely affect) that containment with their actions. <br />Design (containment, transfer, application, storage, and makeup): <br />Equipment, structures, or facilities involving cyanide containment will be reviewed by a properly <br />qualified CCBcV Team Member, assisted as appropriate by qualified consultants, to ensure that <br />the risks of cyanide release are appropriately identified, assessed, and minimi~Pd or prevented. <br />Designs and specifications shall be developed as necessary to achieve and maintain containment <br />of cyanide. <br />Construction (implementation of designs): <br />Construction will adhere to approved designs unless substantive changes are reviewed and <br />approved. Construction activities will be coordinated with operations to assure cyanide <br />containment. <br />8/ I o/00 <br />revised 9/8/00 <br />