iiiiiiiiiiiiiiiiii
<br /> TOTAL RECLAMATION LIABILITY
<br />•
<br /> RECLAMATION CATEGORY
<br /> Units CosVunit Total
<br /> Final Plt Area Grading
<br /> Moffat 1110 ft $123.78 $ 137,396
<br /> West Ridge 1135 ft $123.78 $ 140,490
<br /> Subtotal
<br /> Spoil Grading
<br /> Moffat 8.23 ac $1,894.26 $ 15,590
<br /> West Ridge 2.79 ac $1,894.26 $ 5,285
<br /> Subtotal
<br /> Final Grading
<br /> Moffat 48.54 ac $1,650.44 $ 80,112
<br /> West Ridge 16.6 ac $1,650.44 $ 27,397
<br /> Center Ridge 15.6 ac $1,650.44 $ 25,747
<br /> Subtotal
<br /> Drainage Restablishment
<br /> Moffat $ 137,158
<br /> West Ridge $ 372,565
<br /> Subtotal
<br /> Removal of Facilities
<br /> Silo $ 138,676
<br /> Beltline $ 197,540
<br /> Coal Under Beltline $ 64,641
<br /> Shop/Oifice/Misc $ 337,487
<br /> LoadoutlTipple S 331,811
<br /> Culverts $ 6,826
<br />• Coallnventory $ 63,634
<br /> Coal Storage Area $ 23,644
<br /> Subtotal
<br /> Removal of Powerlines $ 64,719
<br /> Subtotal
<br /> Sediment Pond Removal
<br /> Moffat Pond $ 9,961
<br /> Facilities Pond $ 46,885
<br /> Tipple Ponds $ 733
<br /> Moffat Collection Ditches $ 369
<br /> West Ridge Pond $ 23,400
<br /> Center Ridge Pond $ 26,906
<br /> Subtotal
<br /> Facility, Road and Stockpile Grading
<br /> F~cplosives Storage Area $ 158,855
<br /> Other areas $ 93,881
<br /> Subtotal
<br /> Topsoil Replacement
<br /> Moffat 342.5 ac $2,242.50 $ 768,056
<br /> West Ridge 77.8 ac $1,443.20 $ 112,281
<br /> Tipple Area 13.6 ac $488.47 $ 6,643
<br /> Subtotal
<br /> Revegetation
<br /> Moffat
<br /> Fertilizer 150.5 ac $46.03 $ 6,928
<br /> Contour Furrow 150.5 ac $29.42 $ 4,428
<br /> Permanent Mix 342.5 ac $200.13 $ 71,285
<br /> Woody Stems 342.5 ac $1,392.00 $ 476,760
<br />• Reseeding 150.5 ac $208.13 $ 31,324
<br />$ 277,886
<br />$ 20,875
<br />$ 133,257
<br />$ 509,723
<br />$1,164,259
<br />$ 64,719
<br />$ 108,254
<br />$ 252,736
<br />$ 886,980
<br />Page 1 of 2
<br />
|