My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100411
DRMS
>
Back File Migration
>
Revision
>
REV100411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:53 AM
Creation date
11/22/2007 12:35:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
2/1/1996
Doc Name
BEAR COAL CO MID TERM REVIEW APPLICATION FOR A TR PN C-81-033
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />J.~. STOVER & AS50C~iTES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PNONE: (970) 245-4101, FAR 242-7908 <br />NINB BNGINEERING <br />MINE RECLAMATION <br />January 31, 1996 <br />~II II~II~!I~II~~'I~ <br />CIVIL ENGINEERING <br />CONSTRUCTION MANAGEMENT <br />~-~r ('. r'it .r'r~ <br />FF.[t u ~ 14ah <br />Anthony Waldron <br />Division of Minerals & Geology ~ ~,,,,,,.,. .. udW1idVY <br />1313 Sherman St. , Room 215 Divisl~ ~ ~' ~' <br />Denver, CO 80203 < ~ ~ n ~r~~ ~_'~ <br />J \ ~ t <br />Re: Bear Coal Company S~ \ <br />Mid Term Review ~ `7~~ re>~\~T~ ,,~ <br />Application for a Technical Revision <br />Permit C-81-033 TQ~ ?~~ M-~-~ <br />Dear Mr. Waldron: <br />The Division's letter dated December 1, 1995 transmitted it mid- <br />term review for the Bear Mines. The Division requested that Bear <br />submit a revision to the permit to incorporate updated material <br />that is being requested as part of the review. Enclosed is an <br />application for a technical revision which addresses the Division's <br />concerns. The following point by point discussion should assist <br />the Division in its review of the technical revision application. <br />1. The Division requested that Bear incorporate the requirements <br />of Stipulation Nos. 6, 21 and 32 into the permit application. <br />Stipulation No. 6 requires the submittal of an annual <br />hydrologic report. This requirement is listed as the last <br />item of the current water quality monitoring plan on page <br />2.04-30b. Stipulation No. 32 is also incorporated in the <br />permit on page 2.04-30b. Stipulation No. 21 will be <br />incorporated into the permit by the enclosed revised page <br />2.05-21. <br />2. The location of the 12" diameter drainage culverts near the <br />mine portals was revised on Map 11-1. <br />3. Map 10 was revised to show the location of a proposed wash <br />slab near the equipment repair shop. <br />4. Page 2-OS-18a was revised to indicate the coal screening plant <br />may not be installed. A description of a new wash slab, which <br />Bear intends to construct this year, was added to this page. <br />5. Pages 2.06-3 and 2.06-4 were revised to correct the discussion <br />regarding the Division approved variance from approximate <br />original contours for the Bear No. 2 and Bear No. 3 Mines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.