My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100351
DRMS
>
Back File Migration
>
Revision
>
REV100351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:50 AM
Creation date
11/22/2007 12:35:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Revision
Doc Date
4/11/1988
Doc Name
MEMO RENEWAL BOND CALCULATIONS
From
MLRD
To
FILE
Type & Sequence
RN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment Costs <br />1, Cat D9L Dozer <br />Adjusted hourly dozer production 2,75 hours/acre <br />Total acres 11,67 acres <br />Total equipment cost/hr $139.02 <br />Total job hours 32.09 hours <br />Total job cost $4461,49 <br />2. Cat 14G Motor Grader <br />Adjusted hourly grader production 1,25 hours/acre <br />Total acres 88.25 acres <br />Total equipment cost/hr $72.02 <br />Total job hours 110,35 hours <br />Total job cost $8057.75 <br />Total Leveling and Grading Cost 12,519.24 <br />C. Topsoiling Costs <br />1, Mine Site - Equipment Cat 637 (push-pull) <br />Volume of material <br />*Adjusted BCY/hr <br />Total job time <br />Total job hours (2 <br />Total job cost <br />Total Equipment Co <br />to be placed 161,333 RCY <br />200 BCY/hr <br />806.6 hours <br />scrapers) 403.3 hours <br />$188.42 <br />st/hr $151,991.82 <br />Twelve inches of topsoil will be spread over 100 acres of the mine site. <br />* Adjusted BCY/hr taken from the 1986 Mid-term bond review conducted by <br />Tom Gillis <br />2. Load out - Equipment Cat 637 (push-pull <br />Volume of material to be placed 4934.6 LCY <br />(assume 15% swell for topsoil) <br />Adjusted LCY/hr 442.9 LCY/hr <br />Total job hours 5.57 hours <br />Total job time (1 scraper) 5.57 hours <br />Total equipment cost/hr $188.42 <br />Total job cost $2099.31 <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.