My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV100252
DRMS
>
Back File Migration
>
Revision
>
REV100252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:44 AM
Creation date
11/22/2007 12:34:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Revision
Doc Name
MOFFAT BOND LIABILITY UNDER PRESENT RELEASE CRITERIA
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> -~ iii iiiiiiiiiiiiiiii <br /> <br />Moffat Bond Liability Under Present Release Criteria <br />RECLAMATION CATEGORY Units CosUunit <br />Final Pit Area Greding <br />Moffat 3600 ft $123.78 $ 445,606 <br />Spoil Grading <br />Moffat 24.79 ac $1,894.26 $ 46,959 <br />Final Grading <br />Moffat 99.17 ac $1,650.44 $ 163,674 <br />Drainage Restablishment <br />Moffat $ 144,575 <br />Sediment Pond Removal <br />Moffat Pond $ 9,961 <br />Collection Ditches $ 369 <br />Topsoil Replacement <br />Moffat 150.5 ac $2,242.50 $ 337,496 <br />Revegetation <br />Moffat <br />Fertilizer 150.5 ac $46.03 $ 6,928 <br />Contour Furrows 150.5 ac $29.42 $ 4,428 <br />Permanent Mix 342.5 ac $208.13 $ 71,285 <br />Woody Stems 342.5 ac $1,392.00 $ 476,760 <br />Reseeding 150.5 ac $2D8.13 $ 31,324 <br /> $1,739,365 <br />CONTINGENCIES, PROF. SERVIC ES, MGMT COSTS <br />A Mobilization & Demobilization 10% of Line Items $ 173,937 <br />B Contingencies 10% of Line Items $ 173,937 <br />C Hard Costs Line Items +A+g $2,087,238 <br />D Engineering Costs 10% of Item C $ 208,724 <br />E Reclamation Mgt 8 Admin 5.1 °h of Item C $ 106,449 <br />F Profit 8 Overhead 18.5°h of Item C $ 386,139 <br />G ConVactor Supervision 2.5% of Item C $ 52,181 <br />Total Bond <br />Bond Release Amounts <br />Phase I (1996 or 1997) 60% of Area Total $1,704,439 <br />Remaining Reclamation Categories <br />Sediment Pond Removal <br />Moffat Pond $ 9,940 <br />Collection Ditches $ 369 <br />Topsoil Replacement <br />Moffat 150.5 ac $2,242.50 $ 337,496 <br />Revegetation <br />Moffat <br />Fertilizer 150.5 ac $46.03 $ 6,928 <br />Contour Furrows 150.5 ac $29.42 $ 4,428 <br />Permanent Mix 342.5 ac $208.13 $ 71,285 <br />Woody Stems 342.5 ac $1,392.00 $ 476,760 <br />Reseeding 150.5 ac $208.13 $ 31,324 <br /> <br />$2,840,732 <br />Ta La.e <br />T Ck-G(. aY .~~C.LLI~br <br />Caiv, , ,,. o- lii Uf ..r n .~{ <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.