Laserfiche WebLink
JUN 23 RfC~ <br />Seneca II Mine (Permit No. C-80-005) <br />Permit Renews! No. 03 <br />Stipulation No. <br />Description <br />31. THE PERMIT RENEWAL OF THE SENECA II MINE TS CONDITIONED <br />UPON THE RESOLUTION OF KENTUCKY CNII. PENALTY <br />VIOLATIONS AND BOND FORFEITURE ASSOCIATED WITH PERMIT <br />NUMBER 8980140. PROOF OF RESOLUTION SHOULD BE <br />SUBMITTED TO DMG AS SOON AS IT BECOMES AVAILABLE. <br />32. APPROVAL OFTHE POSTMINING ROAD RETENTION, DEPICTED ON <br />EXHIBIT 12-9, 15 CONDITIONED ON THE SUBMITTAL OF A <br />DETAILED RECLAMATION PLAN IN ACCORDANCE WITH RULE <br />2.05.4(2), AND A REQUEST FROM THE LANDOWNER IN WRITING <br />THAT THE ROAD IS TO BE LEFT OPEN FOR FURTHER USE. <br />33. PRIOR TO PERMANENT CHANNEL RECONSTRUCTION ON ALL <br />RECLAIMED AREAS AT THE SENECA II MINE,' THE OPERATOR <br />SHALL SUBMIT DESIGNS ON THE CHANNELS IN ACCORDANCE <br />WITH RULES 4.05.3 AND 4.05.4. <br />34. BY AUGUST 15, 1997, SENECA COAL COMPANY SHALL PROVIDE <br />THE DNISION WITH A MITIGATION PLAN IN THE FORM OF A <br />TECHNICAL REVISION ADDRESSING THE TOPSOIL DEFICIT AT <br />THE SENECA II MINE. NO TOPSOIL SHALL BE REPLACED ON THE <br />RECLAIMED AREAS UNTIL THE TOPSOIL MITIGATION PLAN IS <br />APPROVED BY THE DNISION. <br />